Description: Tonka Bay, Minnesota
events (24357) minnesota (3673) mn (2328) calendar (1910) bay (985) permits (292) lake minnetonka (22) tonka (17) tree lighting (10) tonka bay (5)
Construction update (a/o 11-15-23) Work on the Manitou Road watermain improvement project has concluded for the year. Temporary traffic control has been removed, equipment and materials have been stored, and temporary erosion control measures have been inspected and/or removed. The contractor will resume work in the spring. If you have restoration needs from the project, please reach out to the project hotline at 952-521-5501 or email us at [email protected] . We will begin residential rest
If you experience an emergency public works issue over the winter, please contact Todd Schallberg, Tonka Bay Public Works Superintendent, at 952-474-2947 or [email protected] . Please do not reach out to Construction Inspector Tom Russell until construction resumes in the spring.
Your continued patience and cooperation are appreciated – thank you!