structural engineer (223) site inspection (12) da approval (4) engineering report (2) western sydney engineer (1) parramatta engineer (1)
The loop monorail at Chassis Brakes manufacturing factory located at 18-24 Abott Road, Seven Hills was redesigned in 1997. This monorail exhibits extensive corrosion in some places.
Air Condition Lifting Frames- We have undertaken a design check of the RailCorp air conditioning lifting frame for certification. The design involved with the complex lifting methodology using cranes.
MWM undertook the design verification of the Monorail systems for the Work Cover workshop at Londonderry, NSW. The project work includes the upgrade strategy of the existing monorails and subsequently supporting structures at the workshop building.